Max. theo. concrete output(L./H) | 40/26 m³/h |
Max.concrete pumping pressure(H./L.) | 10/7.6MPa |
Distribution valve type | S Valve |
Diesel engine model | Weifang Delier 6105ZB |
Max. Theoretical Vertical/Horizontal Conveying Distance | 120/500m |
Dimensions:length×width×height | 5000x1850x1700mm |
Total weight | 4500kg |
Max. theo. concrete output(L./H) | 50/26 m³/h |
Max.concrete pumping pressure(H./L.) | 10/7.6MPa |
Distribution valve type | S Valve |
Diesel engine model | Weifang Delier 6105ZB |
Max. Theoretical Vertical/Horizontal Conveying Distance | 120/500m |
Dimensions:length×width×height | 5000x1850x1700mm |
Total weight | 4500kg |
Max. theo. concrete output(L./H) | 67/45 m³/h |
Max.concrete pumping pressure(H./L.) | 13/7MPa |
Distribution valve type | S Valve |
Diesel engine model | Wechai |
Max. Theoretical Vertical/Horizontal Conveying Distance | 180/800m |
Dimensions:length×width×height | 5800x2000x1750mm |
Total weight | 6500kg |
Max. theo. concrete output(L./H) | 84/45 m³/h |
Max.concrete pumping pressure(H./L.) | 16/11MPa |
Distribution valve type | S Valve |
Diesel engine model | Wechai |
Max. Theoretical Vertical/Horizontal Conveying Distance | 200/800m |
Dimensions:length×width×height | 6300x2100x2350mm |
Total weight | 6900kg |
Max. theo. concrete output(L./H) | M3/h 40/26 |
Max.concrete pumping pressure(H./L.) | 10/8 MPa |
Distribution valve type | S Valve |
Diesel engine model | Wechai |
Max. Theoretical Vertical/Horizontal Conveying Distance | 180/800m |
Hopper capacity x feeding height | 400/1250L/mm |
Electrical engineering power | 45 KW |
Specification | Value |
---|---|
Mixer Model: | Sicoma JS500 Concrete Mixer |
Rated Productivity(m³/h): | 25m3/h |
Gross weight(T): | 15T |
Delivery time: | 3-7 days after received deposit |
Payment term: | L/C, T/T |
Engine Model | Weichai deutz 6105 Turbo-Charged |
Rated Power | 92kw |
Gear Box Model | ZL-315 Power Shift Gearbox |
Hydraulic Pump | Interpump |
Water Supply | Time Relay |
Overall Dimensions(L*W*H) | 8450*3050*4830 |
Wheelbase (mm) | 2850 |
Max. theo. concrete output(L./H) | 40/26 m³/h |
Max.concrete pumping pressure(H./L.) | 10/7.6MPa |
Distribution valve type | S Valve |
Diesel engine model | Weifang Delier 6105ZB |
Max. Theoretical Vertical/Horizontal Conveying Distance | 120/500m |
Dimensions:length×width×height | 5000x1850x1700mm |
Total weight | 4500kg |
Max. Theor. output(high/low pressure) | (m³/h) 66/111 |
---|---|
Rated working pressure | (MPa) 32 |
Hopper capacity | 600 L |
Filling height | 1200 mm |
Engine power | 199kw |
Oil tank cubage | 400 kW |
Chassis brand | FOTON DAIMLER, left drive |
---|---|
Chassis model | BJ1113VFPHG-RA |
Displacement/Power (L/KW) | 6.7/156 |
Displacement standard | Euro III |
Max. driving speed | 90Km/h |
Front wheel base | 1900mm |
Brick | Size(L*W*H) | Pcs/Mould | Cycle Molding | Pcs/Hr |
paving blocks | 200*100*60 | 31 | 18-23s | 4852-6200 |
interlocking bricks | 200*160*60 | 21 | 18-23s | 3287-4200 |
solid blocks | 240*115*53 | 52 | 15-17s | 11011-12480 |
hollow bricks | 390*190*190 | 10 | 20-25s | 1440-1800 |
La bétonnière est un outil très utile en maçonnerie. Comme son nom l'indique, elle permet de fabriquer du béton, par extension des mortiers, par malaxage des divers composants dans une cuve. Que cela soit pour de gros travaux, pour de la rénovation ou bi
2017-5-10 · Prise en main de la bétonnière Un châssis robuste Tous les modèles ont à peu près la même configuration : la cuve et le moteur sont montés sur un … :6
2020-7-15 · En effet la capacité de malaxage ne sera représentera jamais plus de 80% de la capacité de la cuve. Par exemple, si vous choisissez une bétonnière ayant une cuve de volume nominal 150 litres, vous ne pourrez fabriquer qu’au maximum 120 litres de béton dedans, puisqu’il n’est pas possible de remplir à ras bord la cuve. :8
2022-2-19 · La bétonnière thermique a pour avantage d’être totalement autonome. Il n’y a donc pas besoin de prise de courant ni de groupe électrogène. Elle est aussi plus puissante, de 1 à 7 CV, et plus robuste en cas d’utilisation …
2018-4-10 · Après, tout est une question de dosage et de mélange. Pour réaliser un béton, il vous faudra donc 1 volume de ciment, 2 volumes de sable, 3 volumes de graviers pour ½ de volume d’eau. Après il vous faudra doser en fonction de la densité du béton désiré et de l’utilisation que vous en ferez : fondation chape, béton de propreté, etc.
Inquiry
57th, Kexue Avenue, National HI-TECH Industrial Development Zone, Zhengzhou, China.